Changing service lines from the master item list
Hint:
The user must have the permission "Change master item list"
If necessary, you can modify existing master service lines.
The change has no effect on already processed FUTURA Engineering transactions (requisition, order, etc.) in which the master service line is already used, so there is no update of these transactions!
Double-click to open a service line and make the desired change. By clicking on Save, the change is applied.

Changing a master service line in the detail window
SAP integration:
If the service line has already been transferred to SAP, the change is automatically transferred to SAP when saved.

Transfer of the change to SAP